Schedule, inspection and punch list

From release to the signed punch list

Eight steps, in this order, on every lot. Each one says what we do, what we need from the site and what your superintendent gets.

  1. Once per account

    Step 1: Account and plan review

    We price your plan set and agree how releases, site contacts and inspections work.

    • A written bid per plan returned

    • Release method and site contacts agreed

    • Permit office contacts on file

  2. Each lot

    Step 2: Release and schedule

    You send a release. Our scheduler answers with a crew and a date.

    • The lot, the plan and the date the site is ready

    • Crew and date confirmed in writing

    • Date changes go in the same thread

  3. Before the pour

    Step 3: Underground

    Drains and sleeves are set in the slab area or crawlspace before anything is poured or closed.

    • Slab and crawlspace drains and sleeves

    • Elevations checked against the plan

    • Inspection requested before the pour

    Stacks of grey PVC pipe on a dirt construction site
  4. Framing done

    Step 4: Rough-in

    Drain, waste, vent and supply run through the framing.

    • Drain, waste and vent in the framing

    • Supply run, capped and under pressure

    • Stub-outs at the heights on the plan

    A framed hallway with supply and drain pipes run through steel and timber studs
  5. Walls stay open

    Step 5: Rough-in inspection

    We request the inspection, meet the inspector and keep the walls open until it is signed.

    • Tests as your inspector requires

    • Corrections made by us, re-inspection requested by us

    • Your superintendent told when it passes

  6. After paint

    Step 6: Trim and set

    Fixtures and the water heater go in after drywall and paint.

    • Fixtures and water heater set

    • Water on and every joint checked

    • Protective covers left on finished surfaces

    A chrome mixer tap lying on its side on a white basin during installation
  7. Before closing

    Step 7: Final inspection

    Requested once the fixtures are set and the water is on.

    • Final requested by us

    • Inspector's card signed on site

    • Copies to your office

  8. Last step

    Step 8: Punch list and closing

    Your superintendent writes one list for the lot. We close it.

    • One list per lot

    • Each item closed and dated

    • Signed off by your superintendent

    A plain white bathroom with a vanity, a toilet and a bar light, ready for a punch-list walk

Punch list

One list per lot, closed item by item

The punch list is the last place a schedule slips, so we keep it plain. Your superintendent walks the lot and writes what needs fixing. We take the list as written.

How it runs

  • Walk the lot with your superintendent, or take their list

  • Each item names the room, the fixture and what is wrong

  • We close each item and record the date

  • Open items stay on the list until your superintendent signs

An empty kitchen with white cabinets, granite counters and wood-look flooring

Questions

Inspections and the punch list

What happens if rough-in doesn't pass?

We correct what the inspector flags and request the re-inspection. Who pays a re-inspection fee depends on the cause and is set in your account agreement.

When do you need the walls left open?

Until the rough-in inspection is signed. We tell your superintendent the day we request it, and we tell them when it passes.

How is a punch list handled?

Your superintendent writes one list per lot. We close each item, record the date, and the superintendent signs the list off.

What do you need from the site before a crew arrives?

Framing complete for rough-in, a water source for testing, and access for the crew. For trim: drywall and paint done, and the lot clear for fixtures.